About Us

Testimonials

Jon Maddox

To whom it may concern,
ActronAir engaged Tetris Group PLC as main contractor to undertake site services installation works on our recently completed Manufacturing and Distribution facility in Marsden Park. Tetris Group PLC held responsibility for delivery of all Electrical, plumbing and pipe fitting works, under the close supervision of Actron Engineering.

Tetris Group PLC provided all technical trades, tools and lifting equipment to ActronAir for the duration of this highly challenging project. The scope of supply for Tetris Group PLC was as follows;

• Survey and set out of the equipment within scope of Manufacturing and warehouse layout
• Installation of sub-equipment inclusive of;
• R410a Refrigeration supply and control systems
• Electrical Sub boards for each discrete manufacturing cell
• 12 off Gantry and Jib Crane connections
• Oxygen and LPG supply including Purge, clean and solvent rinse prior to commissioning (in accordance with AS/NZS 3500.1:2003 Plumbing and drainage with reference to BCA 2016 amendment 1 and Australian Standard AS4289-1995
• Compressed Air and Nitrogen Generator Systems including ring-main for whole factory
• Guarding and safety interlock systems
• Task Lighting and General Outlets from 10A to 63A 3 Phase and Single Phase
• Post implementation daily support for the duration of the commissioning phase

Tetris Group PLC management worked closely with ActronAir to ensure OH&S processes and procedures were followed without exception. The result for all parties involved was a highly complex system completed without incident on time to budget within a major operating facility.

ActronAir commends Tetris Group PLC for their professionalism in completing this project without incident and would have no hesitation in recommending them to prospective customers.

Jon Maddox, Operations Manager - Actron Engineering
Bob Joiner

This letter shall serve as a recommendation to employ TETRIS GROUP PTY, based on their work history within the Visy Cogen Facility in Coolaroo, Victoria and at Pratt Industries Facility in Conyers, GA

Since 2012 Tetris has performed extensive modifications to the Coolaroo Boiler as well as emergency repairs. Their work includes;

1. Superheater replacement in TP310S. Difficult material to weld and they were on budget and on time with no weld reject from radiography.
2. Increased Fuel Feed opening in the boiler. This required demolition and rebuild of the opening to a larger size using offset tubes. This was on time and on budget.
3. Added 26 combustion air ports to the boiler. This was on time and on budget.
4. Tetris has made numerous repairs to the unit. In which all passed radiographic examination. Their work was completed timely and economically.

Since 2012 Tetris has performed extensive modifications and repairs to the Boiler in Conyers, Ga. Their work includes;

1. Replacement of all superheater tubes on the entrance and exit of superheats 2,3 & 4. Using TP310S. 10001. The work was done on time and on budget.
2. Installation of new down comers. Using 8-inch schedule 160 new down comers were installed from the drum to the bottom of the front wall. The work was done on time and on budget.
3. Replaced a deformed left wall panel. Using A192 2.25in. Panels were replaced making the water wall straight. The work was done on time and on budget.
4. Emergency Repairs. Tetris has been able to respond to emergency request from Australia.

Tetris’ work exceeds industry standard. They arrive on site ready to complete the job in a timely, economic manner. Their quality control insuring only the proper methods and materials are used. In addition, most of the work was performed in very tight spaces, 50mm, requiring mirror welds. Tetris has completed the aforementioned work with no lost time or recordables. From my experience with Tetris since 2012 I would recommend engaging them on Boiler Repair and/or modifications as well as process piping.

Bob Joiner, CM VP12 CEP, Pratt Industries
Brett J

I am writing to you to inform yourself and future clients how pleased we are with your Engineering services.

Visy www.visy.com.au has been using Tetris Group for around 6 months now and are very pleased with the service and quality that you and your staff are providing. There is no task too big or too small that we have given Tetris Group that has been delivered in a timely manner and to a high quality and with very competitive pricing.

We mostly work closely with your Engineering Group especially your manager Nathan Cherry to help with solutions that best suit our manufacturing sites. We have used Tetris Group services for major relocations, breakdowns and repairs. I would be more than pleased to pass my recommendations and experiences onto any future customers you may have.

Looking forward to be working with you and your staff now and in the future.

Brett J, Senior Project Manager
Bob Joiner

This letter shall serve as a recommendation to employ TETRIS GROUP PTY, based on their work history within the Visy Cogen Facility in Coolaroo, Victoria and at Pratt Industries Facility in Conyers, Ga.

Since 2012 Tetris has performed modifications to the Coolaroo Boiler as well as emergency repairs. Their work includes:

1. Superheater replacement in TP310S. Difficult material to weld and they were on budget and on time with no weld reject from radiography.
2. Increased Fuel Feed opening in the boiler. This required demolition and rebuild of the opening to a larger size using offset tubes. This job was on time and on budget.
3. Added 26 combustion airports to the boiler. This job was on time and on budget.
4. Tetris has made numerous repairs to the unit. In which all passed radiographic examination. Their work was completed timely and economically.

Since 2012 Tetris has performed extensive modifications and repairs to the Boiler in Conyers, GA. Their work includes:

1. Replacement of all superheat tubes on the entrance and exit of superheaters 2,3 & 4. Using TP310S.1000. The work was done on time and on budget.
2. Installation of new down comers. Using 8 inch schedule 160 new down comers were installed from the drum to the bottom of the front wall. The work was done on time and on budget.
3. Replaced a deformed left wall panel. Using A192 2.25in. Panels were replaced making the water wall straight. The work was done on time and on budget.
4. Emergency Repairs. Tetris has been able to respond to emergency request from Australia.

Tetris’ work exceeds industry standard. They arrive on site ready to complete the job in a timely, economic manner.

Their quality control insuring only the prper methods and materials are used. In addition, most of the work was performed in very tight spaces, 50mm, requiring mirror welds.

Tetris has completed the aforementioned work with no lost time or recordables.

From my experience with Tetris since 2012 I would recommend engaging them on Boiler Repair and/or modifications as well as process piping.

Bob Joiner, GM VP12 CEP
Derek McInerney

To whom it may concern,

BOC engage Tetris Group PLC as main contractor to undertake installation works of the recently completed Automated Sort & Pick System at our Wetherill Park Facility in Sydney. BOC held responsibility for delivering the initial Prototype System, Phase 1, under the close supervision of Cimcorp OY. Following the successful implementation of Phase 1, BOC had no hesitation to once again engaging the services of Tetris group PLC to assist with implementation of Phase 2 of the project, a scope which was almost double phase 1.

Tetris Group PLC management worked closely with BOC to ensure OH&S processes and procedures were followed without expectation. The result for all parties involved was a highly complex system completed without incident on time to budget within a major operating hazardous facility. BOC commends Tetris Group PLC for their professionalism in completing this project without incident and would have no hesitation in recommending them to prospective customers.

Derek McInerney, Project Manager Technical Delivery
Darren N.

Paul and I continue to work together in Australia and the Asian region providing clients with integrated people solutions. Paul and his team bring a level of professionalism that is not matched by others. Paul's leadership and attention to detail ensures that engineered solutions deliver bottom line results with minimum fuss and ensuring repeat custom from our clients. Paul talks the talk and walks the walk.

Darren N., HR/IR Specialist - Director, Nelson Consulting Group